User's Manual Part 3

Prepare to Leave the Site continued
08/01/2001
5-5
1X SCt4812ET Lite BTS Optimization/ATP
PRELIMINARY
Table 5-6: Remove LMF
Step Action
6 Disconnect the CDMA LMF terminal Ethernet port from the BTS frame.
7 Disconnect the CDMA LMF terminal serial port, the RS–232–to–GPIB interface box, and the
GPIB cables as required for equipment transport.
Connecting BTS T1/E1 Spans
Before leaving the site, connect any T1 or E1 span connectors removed
previously to allow the LMF to control the BTS. Refer to Table 5-7 and
Figure 3-7.
Table 5-7: Connect T1 or E1 Spans
Step Action
1 Re–connect any disconnected span connectors to the Span I/O A and B boards.
2 If equipped, ensure the CSU is powered on.
3 Verify span status, ensuring the OMCR/CBSC can communicate with the BTS.
Before Leaving the site
Be sure all requirements listed in Table 5-8 are completed before leaving
the site.
Table 5-8: Check Before Leaving the Site
Step Action
1 All battery circuit breakers (for occupied shelves) are ON (pushed in).
2 Both heat exchanger circuit breakers on the DC PDA are set to ON (pushed in), and the heat
exchanger blowers are running.
3 The External Blower Assembly (EBA) power cable is connected, and the EBA is running.
4 The MAP power switch is set to ON, and the POWER (green) LED is lighted.
5 The BATT TEST switch on the MAP is set to OFF, and the BATT. TEST (amber) LED is not lighted.
6 No alarm conditions are being reported to the CBSC with all frame doors closed.