User's Manual Part 3

Appendix A: Optimization (PreATP) Data Sheets continued
DRAFT
SC4812ET BTS Optimization/ATP CDMA LMF
Apr 2001
A-2
Site Checklist
Table A-2: Site Checklist
OK Parameter Specification Comments
Deliveries Per established procedures
Floor Plan Verified
Inter Frame Cables:
Ethernet
Frame Ground
Power
Per procedure
Per procedure
Per procedure
Factory Data:
BBX2
Test Panel
RFDS
Per procedure
Per procedure
Per procedure
Site Temperature
Dress Covers/Brackets
Preliminary Operations
Table A-3: Preliminary Operations
OK Parameter Specification Comments
Shelf ID Dip Switches Per site equipage
Ethernet LAN verification Verified per procedure
Comments:_________________________________________________________
A