User's Manual Part 3

Index continued
Apr 2001
SC4812ET BTS Optimization/ATP CDMA LMF
DRAFT
Index-5
Program, TSU NAM, 3-81
Pseudorandom Noise. See PN
ptoff test, 4-8
Punch Block, 3-6
PWR/ALM and ACTIVE LEDs, MCC, 6-26
PWR/ALM LED
BBX2, 6-26
CSM, 6-22
DC/DC Converter, 6-21
generic, 6-21
MCC, 6-26
R
Reconnect BTS IFM connector, 5-3
Reconnect BTS T1 Spans, 5-3
Receive Distribution Card RXDC, 1-28
Reestablish OMCR control, 5-3
Required documents, 1-4, 1-27
Required Test Equipment
Ethernet LAN transceiver, 1-7
substitute equipment, 1-5
RESET Pushbutton, GLI, 6-25
Resetting BTS modules, 5-1
RF Adapters, 1-9
RF Attenuators, 1-9
RF Path Bay Level Offset Calibration, 3-59
RF Test Cable, 1-10
RFDS Fault Isolation, 6-19
RFDS Calibration, 3-79
RFDS Location, SC 4812ET, 1-22
rho test, 4-7
RS232 to GPIB Interface, 1-7
RX, antenna VSWR, test data sheets, A-16
RX and TX paths fail, Troubleshooting, RFDS, 6-19
RX Frame Error Rate (FER) ATP, 4-11
S
SC 4812 BTS Optimization/ATP Test Matrix, B-4
SCLPA, convergence test data sheets, A-7
Selecting Test Equipment, 3-51
Set Antenna Map Data, 3-77
Set RFDS Configuration Data, 3-78
Setting Cable Loss Values, 3-57
Setting Control Port, 3-5
Setting TX Coupler Loss Value, 3-58
SIF, output considerations vs BBX gain set point, C-1
Site, equipage verification, 3-3
Site checklist, verification data sheets, A-2
site equippage, CDF file, 3-2
Span Line (T1/E1) Verification Equipment, 1-10
Span Line connector , 6-13
Span Problems no control link, Troubleshooting, 6-28
SPANS LED, 6-24
Spectrum Analyzer, 1-10
STATUS LED, GLI, 6-24
Supported Test Sets, 3-42
SYNC Monitor Connector, CSM, 6-23
System Connectivity Test, F-5
T
T1, isolate BTS from the T1 spans, 3-4
Telco Interface Board TIB, 1-28
Test data sheets
Alarm verification, A-16
general optimization checklist, A-4
GPS receiver operation, A-5
initial power tests, A-3
LFR receiver operation, A-6
prepower tests, A-3
preliminary operations, A-2
RX antenna VSWR, A-16
SCLPA convergence, A-7
site checklist, A-2
TX antenna VSWR, A-15
TX BLO, A-8, A-13
verification of test equipment used, A-1
Test equipment, verification data sheets, A-1
Test equipment connections , F-1
Test Equipment Policy, 1-4