User's Manual Part 3
RFDS Setup and Calibration – continued
Apr 2001
3-81
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
Program TSU NAM
Follow the procedure in Table 3-45 to program the TSU NAM. The
NAM must be programmed before it can receive and process test calls,
or be used for any type of RFDS test.
Prerequisites
MGLI is INS.
TSU is powered up and has a code load.
Table 3-45: Program NAM Procedure
Step Action
1 Select the RFDS tab.
2 Select the TSU tab.
3 Click on the TSU menu.
4 Click on the Program TSU NAM menu item.
5 Enter the appropriate information in the boxes (see Table 3-39 and Table 3-40) .
6 Click on the OK button to display the status report.
7 Click on the OK button to close the status report window.
3