User's Manual Part 2

CSM System Time GPS & LFR/HSO Verification continued
Apr 2001
3-41
SC4812ET BTS Optimization/ATP CDMA LMF
DRAFT
Table 3-20: LORANC Initialization/Verification
Step NoteAction
2 Verify the following LFR information (highlighted above in boldface type):
Locate the “dot” that indicates the current phase locked station assignment (assigned by MM).
Verify that the station call letters are as specified in site documentation as well as M X Y Z
assignment.
Verify the S/N ratio of the phase locked station is greater than 8.
3 At the CSM> prompt, enter sources <cr> to display the current status of the the LORAN receiver.
Observe the following typical response.
Num Source Name Type TO Good Status Last Phase Target Phase Valid
––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––
0 Local GPS Primary 4 Yes Good 3 0 Yes
1 LFR ch A Secondary 4 Yes
Good 2013177 2013177 Yes
2 Not used
Current reference source number: 1
4
LORAN LFR information (highlighted above in boldface type) is usually the #1 reference source
(verified from left to right).
* IMPORTANT
If any of the above mentioned areas fail, verify:
The LFR antenna is not obstructed or misaligned.
The antenna preamplifier power and calibration twisted pair connections are intact and < 91.4 m
(300 ft) in length.
A dependable connection to suitable Earth Ground is in place.
The search list and PLL station for cellsite location are correctly configured .
NOTE
LFR functionality should be verified using the “source” command (as shown in Step 3). Use the
underlined
responses on the LFR row to validate correct LFR operation.
5 Close the hyperterminal window.
3