Manual

Index
68P09258A31–A
Oct 2003
1X SCt 4812T BTS Optimization/ATP
Index-7
Power Delta Calibration
Advantest, H-5
HP8921A, H-3
HP8935, H-8
Power Input, 6-14
Power Meter, setting GPIB address, HP437B, F-14
Power meter, TX acceptance tests, 4-6
Power Meter Communication Failure,
Troubleshooting, 6-3
Power supply, converter redundancy, 3-111
Power Supply Module Interface, 6-15
power supply/converter redundancy, 3-111
Pre–power tests, test data sheets, A-4
Preliminary operations
cell Site types, 2-2
test data sheets, A-3
Prepare to Leave the Site
BTS Site Span Configuration Verification, 5-5
External Test Equipment Removal, 5-4
Procedures to Copy Files to a Diskette, 5-2
Pushbuttons and Connectors, GLI2, 6-24
PWR/ALM LED
BBX2, 6-27
CSM, 6-22
DC/DC Converter, 6-21
generic, 6-21
MCC, 6-27
R
RDM, 6-14
Reduced ATP, 4-3, 6-9
redundancy/alarm tests, 3-109
Redundant GLIs, Enable, 3-42
Reference Distribution Module, 6-14
Required documents, 1-12
Required test equipment, communications system
analyzer, 1-9
Required Test Equipment and Software, 1-6
RESET Pushbutton, GLI2, 6-24
Revision History, xxv
RF
Adapters, 1-10
Attenuators, 1-10
Load, 1-10
RF Path Calibration, 3-89
RFDS
Calibration, 3-106
DC Power Pre–test, 2-12
Description, 3-99
initial power–up, 2-15
Layout, 1-35
Parameter Settings, 3-99
Set Configuration Data, 3-105
RFDS calibration, procedure, 3-107
RFDS parameters
checking, 3-100
setting, 3-100
RFDS TSU Calibration Channel Frequencies, 3-106
rho, 4-7
ROM Code, Download, G-2
router configuration, initial , J-20
Router Configuration Files, Canned, J-8
Router Initial Configuration, J-2
router power–up, J-20
Router Serial Communication, J-5
RS–232 to GPIB Interface, 1-8
RS232 GPIB Interface Box, F-16
RX, antenna VSWR, test data sheets, A-18
RX Acceptance Tests, Frame Error Rate, 4-8
S
Sector Configuration, 1-30
Selecting Test Equipment, 3-75
Set Antenna Map Data, 3-104
Set RFDS Configuration Data, 3-105
Set–up for TX Calibration, 3-91
Setting Cable Loss Values, 3-83
Setting TX Coupler Loss Value, 3-84
SGLI2, board detail, MMI port connections, 5-6
Shelf Configuration Switch, 2-4
Signal Generator, 3-82
signal generator, 1X FER acceptance test, 4-6
Site, equipage verification, 3-4