User's Manual Part 3

Automated Acceptance Test Procedures Allinclusive TX & RX
Mar 2001
4-1
SCt4812T CDMA BTS Optimization/ATP
DRAFT
Introduction
The Automated Acceptance Test Procedure (ATP) allows Cellular Field
Engineers (CFEs) to run automated acceptance tests on all equipped BTS
subsystem devices using the Local Maintenance Facility (LMF) and
supported test equipment per the current Cell Site Data File (CDF)
assignment.
The results of these tests (at the option of the operator) are written to a
file that can be printed. All tests are controlled from the LMF platform
using the GPIB interface, therefore, only recommended test equipment
supported by the LMF can be used.
This chapter describes the tests run from the GUI environment, which is
the recommended method. The GUI provides the advantages of
simplifying the LMF user interface, reducing the potential for miskeying
commmands and associated parameters, and speeding up the execution
of complex operations involving multiple command strings. If you feel
the command line interface (CLI) will provide additional insight into the
progress of ATPs and problems that could possibly be encountered, refer
to LMF CLI Commands, R15.X (68P09251A59).
Before performing any tests, use an editor to view the
CAVEATS section of the readme.txt file in the c:\wlmf
folder for any applicable information.
The ATP test is to be performed on out-of-service (OOS)
sectors only.
DO NOT substitute test equipment not supported by the
LMF.
IMPORTANT
*
Refer to Chapter 3 for detailed information on test set
connections for calibrating equipment, cables and other test
set components, if required.
NOTE
Customer requirements determine which ATP tests to are to be
performed, and the craftsperson selects the appropriate ATP tests to run.
The tests can be run individually or as one of the following groups:
All TX: TX tests verify the performance of the BTS transmit line up.
These include the GLI, MCC, BBX, and CIO cards, the LPAs and
passive components including splitters, combiners, bandpass filters,
and RF cables.
All RX: RX tests verify the performance of the BTS receiver line up.
These include the MPC (for starter frames), EMPC (for expansion
frames), CIO, BBX, MCC, and GLI cards and the passive components
including RX filters (starter frame only), and RF cables.
. . . continued on next page