BTS Redundancy/Alarm Testing continued
DRAFT
SCt4812T CDMA BTS Optimization/ATP
Mar 2001
3-96
68P09253A61
MGLI/GLI Redundancy Test
This test can only be performed when the MM path is
established by the MM (not just with LAPD link
connected). Attempting to force the GLIs to hot swap
under alarm monitor control, when isolated from the MM,
causes MGLIs to hang up.
CAUTION
Table 3-52: MGLI/GLI Redundancy Test (with MM Connection Established)
Step Action
NOTE
This test assumes the alarm monitor is NOT connected to the BTS and the T1/E1 span is connected
and communication is established with the MM.
BOTH GLIs must be INS before continuing.
1 Verify the BBXs are enabled and a CDMA carrier is present.
2 Identify the primary and redundant MGLI pairs.
3 Pull the MGLI that is currently INSACT and has cage control.
4 Observe the BBX remains GREEN, and the redundant MGLI is now active.
5 Verify no other modules go OOS due to the transfer of control to the redundant module.
6 Verify that the BBXs are enabled and a CDMA carrier is present.
7 Reinstall the MGLI and have the OMCR/CBSC place it back in-service.
8 Repeat Steps 1 through 7 to verify the other MGLI/GLI board.
3