User's Manual
Pre–Power–up Tests
SC 4812T CDMA BTS Optimization/ATP
May 2000
2-4
Objective
This procedure checks for any electrical short circuits and verifies the
operation and tolerances of the cellsite and BTS power supply units prior
to applying power for the first time.
Test Equipment
The following test equipment is required to complete the pre–power–up
tests:
Digital Multimeter (DMM)
Always wear a conductive, high impedance wrist strap
while handling the any circuit card/module to prevent
damage by ESD.
CAUTION
Cabling Inspection
Using the site-specific documentation generated by Motorola Systems
Engineering, verify that the following cable systems are properly
connected:
Receive RF cabling – up to 12 RX cables
Transmit RF cabling – up to six TX cables
GPS
LFR
For positive power applications (+27 V):
The positive power cable is red.
The negative power cable (ground) is black.
For negative power applications (–48 V):
The negative power cable is red or blue.
The positive power cable (ground) is black.
In all cases, the black power cable is at ground potential.
IMPORTANT
*
2