User's Manual
Index – continued
May 2000
SC 4812T CDMA BTS Optimization/ATP
Index-7
Code Domain Power and Noise Floor Measurement
Failure, 6-9
Code Download Failure, 6-4
Communications Analyzer Communication Failure,
6-3
CSM Checklist, 6-11
Data Download Failure, 6-4
DC Power Problems, 6-18
Device Enable (INS) Failure, 6-5
Login Failure, 6-2
MGLI2 Control Good – No Control over AMR,
6-16
MGLI2 Control Good – No Control over
Co–located GLI2, 6-15
Miscellaneous Failures, 6-5
Multi–FER Failure, 6-10
No BBX2 Control in the Shelf – No Control over
Co–located GLI2s, 6-16
No DC Input Voltage to any C–CCP Shelf Module,
6-19
No DC Input Voltage to Power Supply Module,
6-18
No GLI2 Control through Span Line Connection,
6-15
No GLI2 Control via LMF, 6-15
Power Meter Communication Failure, 6-2
Rho and Pilot Time Offset Measurement Failure,
6-8
Span Problems no control link, 6-27
TX and RX Signal Routing, 6-19
TX Mask Measurement Failure, 6-8
TSU NAM
Parameters, 3-74
Program, 3-79
TX, antenna VSWR, test data sheets, A-16
TX & RX Path Calibration, 3-59
TX and RX Frequency vs Channel
1700 MHz, E-7
1900 MHz, E-2
800 MHz, E-4
TX and RX Signal Routing, C–CCP Backplane
Troubleshooting, 6-19
TX Audit Test, 3-67
TX BLO, test data sheets
Offset/Power Output Verification, A-9
Power Output Verification, A-14
TX Coupler, Setting Loss Value, 3-58
TX Mask Verification, spectrum analyzer display,
illustration, 4-7
TX OUT connection, 4-2
TX Output Acceptance Tests
Code domain power, 4-5, 4-10
introduction, 4-5
Pilot Time Offset, 4-5, 4-9
Spectral purity TX mask, 4-5, 4-6
Waveform quality (rho), 4-5, 4-8
TX path, 1-3
audit, 3-67
calibration, 3-64
TX Path Calibration, 3-60
txmask test, 4-6
U
Unshielded Twisted Pair. See UTP
Updating LMF Files, 5-6
UTP
cable (RJ11 connectors), 3-5
LMF to BTS connection, 3-5
V
Verification of Test Equipment, data sheets, A-1
Verify Span Parameter Configuration, procedure, 5-3
Virtual BTS, 3-6
Voltage Standing Wave Ratio. See VSWR
VSWR
Advantest Test Set, G-4
Calculation, G-3, G-5
Equation, G-3, G-5
manual test setup detail
Advantest illustration, G-6
HP illustration, G-3, G-4
required test equipment, G-1
transmit and receive antenna, G-1
W
Walsh channels, 4-10
Warm–up, 1-5
Waveform Quality (rho) ATP, 4-8
When to optimize
Ancillary – table, C-1