User's Manual
Index – continued
SC 4812T CDMA BTS Optimization/ATP
May 2000Index-6
Rubidium Standard Timebase, 3-39
RX, antenna VSWR, test data sheets, A-17
RX Acceptance Tests, Frame Error Rate, 4-5, 4-12
RX path, 1-3
S
Sector Configuration, 1-25
Set Antenna Map Data, 3-76
Set Span Parameter Configuration, procedure, 5-4
Setting Cable Loss Values, 3-57
Setting TX Coupler Loss Value, 3-58
SGLI2, board detail, MMI port connections, 5-4
Shelf Configuration Switch, 2-3
Signal Generator, 3-54, 3-55
Site, equipage verification, 3-3
Site checklist, data sheets, A-2
Site Documents, required, 1-11
Site equipage, CDF file, 3-2
Site I/O board
E1 span isolation, illustration, 3-4
T1 span cable connection, 5-8
T1 span isolation, illustration, 3-4
Span Line
connector , 6-13
T1/E1 Verification Equipment, 1-10
Span Parameter Configuration
set, procedure, 5-4
verification, procedure, 5-3
Span Problems no control link, Troubleshooting, 6-27
SPANS LED, GLI, 6-23
Spectral Purity Transmit Mask ATP, 4-6
Spectrum Analyzer, 1-10, 3-54, 3-55
Spectrum Analyzer , HP8594E, 3-39
STATUS LED, GLI, 6-23
SYNC Monitor Connector, CSM, 6-22
System Connectivity Test, HP8921A, F-2
T
T1
isolate BTS from the T1 spans, 3-4
span connection, 5-8
Test data sheets
AMR CDI Alarm Input Verification, A-17
BTS redundancy/alarm tests, A-16
general optimization checklist, A-4
GPS receiver operation, A-5
initial power tests, A-3
LFR receiver operation, A-6
LPA
convergence, A-8
IM Reduction, A-7
pre–power tests, A-3
preliminary operations, A-2
RX antenna VSWR, A-17
site checklist, A-2
TX antenna VSWR, A-16
TX BLO
Offset/Power Output Verification, A-9
Power Output Verification, A-14
Test Equipment
Automatically Selecting, 3-51
Calibrating, 3-52
Connecting test equipment to the BTS, 3-39
Manually Selecting, 3-50
Reference Chart, 3-40
Selecting, 3-50
verification data sheets, A-1
VSWR, G-1
Test Equipment Setup, 3-39
GPS, 3-30
HP PCS Interface, F-7
LFR/HSO, 3-30
RF path calibration, 3-63
Test Matrix, C-4
ATP optimization, C-2
Test Set, Calibration, 3-49
Timing Reference Cables, 1-8
Top Interconnect Plate, 1-13
Troubleshooting, 6-1, 6-17
BBX2 Control Good – No (or Missing) Span Line
Traffic, 6-16
BLO Calibration Failure, 6-6
C–CCP Backplane, 6-13, 6-14
Calibration Audit Failure, 6-7