User's Manual
Index – continued
SC 4812T CDMA BTS Optimization/ATP
May 2000Index-4
HP8921A, System Connectivity Test, F-2
HSO, initialization/verification, 3-38
HSO Initialization/Verification, 3-29
I
I and Q values, B-1
Initial Installation of Boards/Modules, preliminary
operations, 2-1
Initial power tests, test data sheets, A-3
Initial power–up
BTS frame, 2-14
RFDS, 2-14
Initialization/Verification
GPS, 3-32
HSO, 3-38
LFR, 3-35
Installation and Update Procedures, 3-9
Intended reader profile, 1-11
Inter–frame cabling, when to optimize, C-2
IS–97 specification, B-1
ISB connectors, 6-13
Isolation, T1/E1 Span, 3-4
Itasca Alarms Test Box, 1-10
L
LAN
BTS frame interconnect, illustration, 3-15
Connectors, GLI, 6-24
Tester, 1-10
LED, CSM, 3-29
LED Status, 6-20
BBX2, 6-25
CSM, 6-21
DC/DC Converter, 6-20
GLI, 6-23
LPA, 6-26
MCC, 6-25
LFR
Initialization / Verification, 3-35
receiver operation, test data sheets, A-6
LFR/HSO, Test Equipment Setup, 3-30
LMF, 1-5
Ethernet maintenance connector interface detail,
illustration, 3-5
Termination and Removal, 5-7
to BTS connection, 3-5
LMF Removal, 5-7
Loading Code, 3-21
Logging In, 3-19
Logging Out, 3-20
Logical BTS, 3-6
Login Failure, Troubleshooting, 6-2
LPA, test data sheets
convergence, A-8
IM Reduction, A-7
LPA Module LED, 6-26
M
Manual
layout, 1-1
overview, 1-2
MASTER LED, GLI, 6-23
MCC, Enable, 3-27
MCC/CE, 4-10
MGLI2
board detail, MMI port connections, 5-4
Download, 3-22
Miscellaneous errors, Troubleshooting, 6-5
MMI Connector
CSM, 6-22
GLI, 6-24
MCC, 6-25
Model SLN2006A MMI Interface Kit, 1-8
Module status indicators, 6-20
Multi–FER test Failure, Troubleshooting, 6-10
N
NAM, Valid Ranges, 3-75
No AMR control, 6-16
No BBX2 control in the shelf, 6-16
No DC input voltage to Power Supply Module, 6-18
No DC voltage +5 +65 or +15 Volts to a specific
GLI2 BBX2 or Switch board, 6-19