User's Manual
Index – continued
May 2000
SC 4812T CDMA BTS Optimization/ATP
Index-3
CSM frequency verification, 3-30
CyberTest, 3-39
D
Data Download Failure, Troubleshooting, 6-4
DC Distribution Pre–test
BTS frame detail, 2-7, 2-9
RFDS detail, 2-11
DC Power Pre–test
BTS Frame, 2-5
RFDS, 2-11
DC Power Problems, C–CCP Backplane
Troubleshooting, 6-18
DC/DC Converter, LED Status Combinations, 6-20
Device Enable (INS) Failure, Troubleshooting, 6-5
Digital Control Problems, 6-15
C–CCP Backplane Troubleshooting, 6-15
Digital Multimeter, 1-8
Directional Coupler, 1-9
Download
BLO, 3-66
BTS, 3-21
BTS system software, 3-3
MGLI, 3-22
Non–MGLI2 Devices, 3-24
E
E1, isolate BTS from the E1 spans, 3-4
Enable
CSMs, 3-25
MCCs, 3-27
Redundant GLIs, 3-27
Enabling Devices, 5-2
Equipment setup, VSWR, HP Test Set, G-2
Ethernet LAN
interconnect diagram, 3-15
Transceiver, 1-6
Ethernet maintenance connector interface, illustration,
3-5
F
FER test, 4-12
Folder Structure Overview, 3-11, 3-14
Frame Error Rate, 4-5
ATP, 4-12
FREQ Monitor Connector, CSM, 6-22
Frequency counter, optional test equipment, 1-9
Frequency Spectrum
Korean PCS (1700 MHz), E-6
North American Cellular Telephone System (800
MHz), E-4
North American PCS (1900 MHz), E-1
G
Gain set point, BBX, D-1
Generating an ATP Report, 4-13
General optimization checklist, test data sheets, A-4
Gigatronics Power Meter, 3-39
GLI. See Master (MGLI2) and Slave (SGLI2) Group
Line Interface
GLI Connector, 6-14
GLI Ethernet A and B Connections, 6-14
GPIB Cable, Cable, 1-8
GPS
Initialization/Verification, 3-32
receiver operation, test data sheets, A-5
satellite system, 3-26
Test Equipment Setup, 3-30
Graphical User Interface, 3-6
GUI, 3-6
H
LMF Hardware Requirements, 1-6
Hewlett–Packard HP 8921, 3-39
Hewlett–Packard HP 8935, 3-39
High Stability 10 MHz Rubidium Standard, 1-10
High–impedance Conductive Wrist Strap, 1-9
HP 437B, 3-39
HP 83236A, F-2
HP PCS Interface Test Equipment Setup for Manual
Testing, F-7
HP Test Set, VSWR, G-2
HP83236 , F-3