Optimization (Pre–ATP) Data Sheets – continued
May 2000
A-3
SC 4812T CDMA BTS Optimization/ATP
Pre–Power and Initial Power
Tests
Table A-4: Pre–power Checklist
OK Parameter Specification Comments
Pre–power–up tests Verify power supply
output voltage at the top
of each BTS frame is
within specifications
Internal Cables:
ISB (all cages)
CSM (all cages)
Power (all cages)
Ethernet Connectors
LAN A ohms
LAN B ohms
LAN A shield
LAN B shield
Ethernet Boots
verified
verified
verified
verified
verified
isolated
isolated
installed
Air Impedance Cage (single cage) installed
Initial power–up tests Verify power supply
output voltage at the top
of each BTS frame is
within specifications:
Comments:_________________________________________________________
A