User's Manual

Troubleshooting: Download – continued
May 2000
6-5
SC 4812T CDMA BTS Optimization/ATP
Cannot ENABLE Device
Before a device can be enabled (placed in-service), it must be in the
OOS_RAM state (yellow) with data downloaded to the device. The color
of the device changes to green, once it is enabled.
The three states that devices can be changed to are as follows:
Enabled (green, INS)
Disabled (yellow, OOS_RAM)
Reset (blue, OOS_ROM)
Follow the procedure in Table 6-6 to troubleshoot a device enable
failure.
Table 6-6: Troubleshooting Device Enable (INS) Failure
Step Action
1 Re-seat the card and repeat the code and data load procedure.
2 If the CSM cannot be enabled, verify the CDF file has correct latitude and longitude data for cell
site location and GPS sync.
3 Ensure the primary CSM is in INS_ACT state.
NOTE
MCCs will not go INS without the CSM being INS.
4 Verify the 19.6608 MHz CSM clock; MCCs will not go INS otherwise.
5 The BBX2 should not be enabled for ATP tests.
6 If MCCs give “invalid or no system time,” verify the CSM is operable.
Miscellaneous Errors
Perform the procedure in Table 6-7 to troubleshoot miscellaneous
failures.
Table 6-7: Miscellaneous Failures
Step Action
1 If LPAs continue to give alarms, even after cycling power at the circuit breakers, then connect an
MMI cable to the LPA and set up a Hyperterminal connection. Enter
ALARMS in the
Hyperterminal window. The resulting LMF display may provide an indication of the problem.
(Call Field Support for further assistance.)
6