User's Manual

Prepare to Leave the Site
May 2000
5-1
SC 4812T CDMA BTS Optimization/ATP
External Test Equipment
Removal
Perform the procedure in Table 5-1 to disconnect the test equipment and
configure the BTS for active service.
Table 5-1: External Test Equipment Removal
Step Action
1 Disconnect all external test equipment from all TX and RX connectors on the top of the frame.
2 Reconnect and visually inspect all TX and RX antenna feed lines at the top of the frame.
Verify that all sector antenna feed lines are connected to the
correct ports on the frame. Crossed antenna cables will
cause system degradation of call processing.
CAUTION
Each module or device can be in any state prior to
downloading. Each module or device will be in an
OOS_RAM state after downloading has completed.
For all LMF commands, information in italics
represents valid ranges for that command field.
Only those fields requiring an input will be specified.
Default values for other fields will be assumed.
For more complete command examples (including
system response details), refer to the CDMA LMF
User Guide.
NOTE
5