User's Manual
Bay Level Offset Calibration – continued
May 2000
3-69
SC 4812T CDMA BTS Optimization/ATP
Prerequisites
Before running this test, ensure that the following have been done:
CSM–1, GLI2s, BBX2s have correct code and data loads.
Primary CSM and MGLI2 are INS.
All BBXs are OOS_RAM.
Test equipment and test cables are calibrated and connected for TX
BLO calibration.
LMF is logged into the BTS.
Follow the procedure in Table 3-36 to perform the All Cal/Audit test.
Before installing any test equipment directly to any TX
OUT connector, first verify there are no CDMA BBX2
channels keyed. Failure to do so can result in serious
personal injury and/or equipment damage.
WARNING
Table 3-36: All Cal/Audit Test
Step Action
1 Select the BBX2(s) to be tested.
2 From the Tests menu, select All Cal/Audit.
3 Select the appropriate carrier(s) displayed in the Channels/Carrier pick list.
Press and hold the <Shift> or <Ctrl> key to select multiple items.
4 Type the appropriate channel number in the Carrier n Channels box.
5 Click on OK.
6 Follow the cable connection directions as they are displayed.
A status report window displays the test results.
7 Click on Save Results or Dismiss to close the status report window.
3