Step Action
13 Seat the Pilot Beacon, Heat Exchanger, ETIB, and Options circuit breakers to ON one at a time.
Repeat step 5 after pushing in each circuit breaker.
14 Set all DC PDA circuit breakers to OFF (pulled out).
Applying AC Power
Once AC voltage measurements are complete, apply AC power to the
Power Cabinet. Table 2-5 provides the procedure for applying AC
power.
Table 2-5: Applying AC Power
Step Action
1 After cabinet AC input voltages are verified as correct, turn the Main AC breaker (located on the front
of the AC Load Center) ON. Observe that all eight (8) green LEDs on the front of the ACLC are
illuminated (see Figure 2-4).
2 On the ACLC, Turn RECT. 1 and RECT. 2 AC branch breakers ON. All the installed rectifier
modules (see Figure 2-3) will start up, and the green DC and PWR LEDs should light on each.
3 Turn the Meter Alarm Panel module, ON (see Figure 2-6). The Meter Alarm Panel voltage meter
should read approximately 27.4 +
0.2 VDC.
4 Turn the Temperature Compensation Panel (TCP) ON, (see Figure 2-7). Verify that the Meter Alarm
Control Panel does not have any alarm LEDs illuminated.
5 Check the rectifier current bargraph displays (green LED display on the rectifier module). None
should be illuminated at this point.
If batteries are fitted, turn on the two battery heater AC
breakers on the AC Load Center.