User Manual
Index – continued
08/15/2000
SC 4812ETL BTS Optimization/ATP
PRELIMINARY
Index-7
Test Equipment Setup, 3-47
Test Equipment Setup Calibration for TX Bay Level
Offset, 3-61, F-14
Test Equipment Setup Chart, 3-48
Test equipment setup RF path calibration, 3-68
Test Set Calibration, 3-55
Timing reference cables, required test equipment
Model SGLN1145A/4132A CSMs, 1-9
Model SGLN4132B CSMs, 1-9
Transmit TX path audit, 3-72
Transmit TX path calibration, 3-68
Transmit/Receive Module TRX, 1-20
Troubleshooting
DC Power Problems, 6-18
Set span configuration, 6-30
span problems, 6-29
TX and RX Signal Routing, 6-19
Troubleshooting CSM Checklist, 6-12
TX
acceptance tests
code domain power/noise floor, 4-15
equipment setup, 4-3
pilot time offset, 4-13
spectral purity mask, 4-9
spectrum analyzer display, 4-11
waveform quality (rho), 4-12
all inclusive TX ATP test, 4-4
antenna VSWR, test data sheets, A-10, A-11
BLO test data sheets, A-8
output acceptance tests
code domain power noise, 4-7
pilot time offset, 4-7
waveform quality, 4-7
TX & RX Path Calibration, 3-64
TX and RX Frequency vs Channel , D-2
TX and RX Signal Routing, C–CCP Backplane
Troubleshooting, 6-19
TX Audit Test, 3-73
TX Bay Level Offset and TX ATP test equipment
setup calibration, 3-60
tx fine adjust, E-1
TX Path Calibration, 3-65
TX/RX OUT Connections, 4-2
U
UNIX, shut down on LMF, 5-4
Unshielded Twisted Pair. See UTP
Updating CDMA LMF Files, 5-1
UTP, LMF to BTS connection, 3-20
V
Verify
test equipment used, test data sheets, A-1
TX output, 4-3
version Folder, 3-17
Virtual BTS, 1-14
W
Waveform quality (Rho), acceptance test procedure,
4-12
When to optimize
Ancillary – table, B-1
BTS, B-1
inter–frame cabling, B-2
X
XCVR Backplane Troubleshooting, 6-14
Xircom Model PE3–10B2
LMF to BTS connection, 3-20
remove from BTS, 5-4