User Manual
Appendix A: Optimization (Pre–ATP) Data Sheets – continued
PRELIMINARY
SC 4812ETL BTS Optimization/ATP
08/15/2000
A-4
General Optimization Checklist
Table A3b: Pre–power Checklist
OK Parameter Specification Comments
-
-
LEDs
Frame fans
illuminated
operational
-
-
-
-
LMF to BTS Connection
Preparing the LMF
Log into the LMF PC
Create site specific BTS directory
Download device loads
per procedure
per procedure
per procedure
per procedure
-
-
Ping LAN A
Ping LAN B
per procedure
per procedure
-
-
-
-
-
-
-
-
-
Download/Enable MGLI2s
Download/Enable GLI2s
Set Site Span Configuration
Download CSMs
Enable CSMs
Enable CSMs
Download/Enable MCC24s
Download BBX2s
Download TSU (in RFDS)
Program TSU NAM
per procedure
per procedure
per procedure
per procedure
per procedure
per procedure
per procedure
per procedure
per procedure
- Test Set Calibration per procedure
Comments:_________________________________________________________
A