Installation Instructions
Dimensions and Clearances – continued
PRELIMINARY
SCt300 BTS Hardware Installation, ATP and FRU Procedures
DEC 2000
2-18
Figure 2-10: Concept of Functionality Clearances for MicroCell and PicoCell Units
THIS ILLUSTRATION SHOWS THE CONCEPT OF HOW
THE AREA ABOVE AND BELOW THE SCt340 BTS
SHOULD BE AT LEAST 25% UNOBSTRUCTED. THERE
IS NO BOX AROUND THE UNIT. BOX IS USED FOR
ILLUSTRATION PURPOSES ONLY
2