Installation Instructions
BTS Configuration – continued
PRELIMINARY
SCt300 BTS Hardware Installation, ATP and FRU Procedures
DEC 2000
7-20
Table 7-8: Verify BTS Sync Mode
Step Action
1 If an MMI session was established, proceed to step 6. If no MMI session is running, proceed to
step 2.
2 Connect the MMI/LMF.
3 Open an MMI Communication session.
4 Simulate an LMF connection by issuing the sndtype 0xa178 command.
5 Verify that the BTS is in OOS_RAM status by issuing the status command.
6 Observe the condition of the External indicator.
7 No further action is required if the BTS is in the desired Sync mode. Continue with Step 8 if the
Sync mode needs to be altered.
8 Push the Sync button to change the BTS Sync mode.
9 Reset the BTS using the Reset button in the Diagnostic Access Area.
10 If no additional MMI sessions are required at this time, exit the MMI session and HyperTerminal
connection by selecting File>Exit.
If you are continuing the MMI session, proceed to Table 7-9.
Synchronization Verification
The DPLL within the BTS must be tracking either RGPS or HSO in
order to perform ATP. Use the procedure in Table 7-9 to verify DPLL
tracking.
Table 7-9: Verify DPLL Tracking
Step Action
1 If an MMI session was established, proceed to step 6. If no MMI session is running, proceed to
step 2.
2 Connect the MMI/LMF.
3 Open an MMI Communication session.
4 Simulate an LMF connection by issuing the sndtype 0xa178 command.
5 Verify that the BTS is in OOS_RAM status by issuing the status command.
6 If an RGPS is not present, go to Step 9.
. . . continued on next page