Installation Instructions

BTS Preparation – continued
DEC 2000
7-3
SCt300 BTS Hardware Installation, ATP and FRU Procedures
PRELIMINARY
Figure 7-3 shows the location of the AC power breakers inside the
optional Primary Surge Suppressor. The AC breakers must be closed
before you power up the Microcell or Picocell unit.
Figure 7-2: Location of AC and DC Power Breakers
AC POWER BREAKER
DC POWER BREAKER
0182–O_IL.doc
MICROCELL SHOWN
7