Installation Instructions
Powering on Unit and Mounting the Solar Cover – continued
DEC 2000
6-53
SCt300 BTS Hardware Installation, ATP and FRU Procedures
PRELIMINARY
Table 6-46: Procedure to Power on the Surge Suppressor, the Unit, and
Mount the Solar Cover
Step Action
1 If closed, open the front cover of the Primary Surge
Suppressor. Use the tamper–resistant key and turn both the
locks counter–clockwise. Refer to Figure 6-37.
2 If not applying AC power, go to step 6. If applying AC
power, push the main AC power breaker on the Surge
Suppressor to the “On“ position. Refer to Figure 6-38.
3 Push the AC power breakers for each individual carrier to the
“On” position. All unused power breakers must be in the
“Off” position.
4 Close the Primary Surge Suppressor door. Use the
tamper–resistant key to turn the locks clockwise to the
“Locked” position.
5 Push down on the AC power breaker on the unit until it clicks
and remains down. The white collar on the breaker is not
visible when the breaker is closed.
6 If not applying DC power or providing for battery backup, go
to step 7. If applying DC power or have short or long
duration batteries present, push down on the DC power
breaker until it clicks and remains down. The white collar on
the breaker is not visible when the breaker is closed.
7 Position the solar cover so the cooling vents are at the top and
place the solar cover on the unit. Use the tamper–resistant
key to tighten the four screws (two on each side) to 2.2 N–M.
Refer to Figure 6-39.
6