Installation Instructions

Generate an ATP Report
DEC 2000
8-11
SCt300 BTS Hardware Installation, ATP and FRU Procedures
PRELIMINARY
Background
Each time an ATP test is run, an ATP report is updated to include the
results of the most recent ATP tests if the Save Results button is used
to close the status report window. The ATP report will not be updated if
the status reports window is closed with use of the Dismiss button.
ATP Report
A separate report is created for each BTS and includes the following for
each test:
S Test name
S PASS or FAIL
S Description information (if applicable)
S MAWI number
S Channel number
S Carrier number
S Sector number
S Upper test limit
S Lower test limit
S Test result
S Time stamp
S Details/Warning information (if applicable)
Follow the procedures in Table 8-5 to view and create a printable file for
the ATP report of a BTS.
Table 8-5: Generate an ATP Report
Step Action
1 Click on the Login tab if it is not in the forefront.
2 Select the desired BTS from the Available Base Stations pick list.
3 Click on the Report button.
4 Start the report if desired by clicking on a column heading.
5 Click on the Dismiss button if you do not want to create a printable file copy.
6 To create a printable file, select the desired file type in the picklist and then click on the Save
button.
Refer to the LMF help screens, or the CDMA LMF
Operators Guide, 68P64114A21, for information on how
to print an ATP report.
NOTE
8