Table 7-19: R3465 Calibration Procedure
Step Action
4 Verify that the CDMA Clock Source References are set correctly:
S Push the ADVANCE key
S Push the CDMA Sig. CRT menu key
S Push the Setup CRT menu key
S Push the Ref Clock CRT menu key
If required, change SynthRef (MHz) to 10
(rotate the vernier knob to set, push the vernier knob to enter)
If required, change CDMA–TB Source to 19.6608
(rotate the vern
i
er knob to set push the vern
i
er knob to enter)
(
ro
t
a
t
e
th
e vern er
k
no
b
t
o se
t
, pus
h
th
e vern er
k
no
b
t
o en
t
er
)
S Verify that ON is active in the Output CRT menu key
S Verify that OFF is active in the Mod CRT menu key
S Push the return menu key
S Push the return menu key again
* IMPORTANT
Test equipment warm–up may vary depending on operating environment or initial temperature of
unit upon turn–on. Consult test equipment OEM documentation for additional information as
required.
5 Connect the male BNC to male N cable between the CAL OUT connector and the INPUT 50 W
connector.
6 Perform the following to run the internal calibration on the test set:
S Select CW
S Push the SHIFT and CAL pushbuttons
Select Cal All in CRT menu.
Internal calibration should complete in about 6 minutes.
7