User's Manual

InstallationoftherackChapter3:Frame-basedeNodeBInstallation
Installationoftherack
TheInstallationoftheracksectionprovidesprocedurestoinstallandgroundtherack.
Rackandgroundcableinstallation
TheRackandgroundcableinstallationsectionprovidestheproceduretomountthestandard
19-inchracktotheoorandinstallthegroundcable.
TheLTEsystemcanbeinstalledina19-inchracksuppliedbyMotorolaoracustomer-supplied
rack.TheMotorolarackisrecommended,asitensuresthatthepropergroundpathisachieved
throughchassisgroundsthroughthePDUandRadioFilterShelfmechanicswithouttheuseof
separategroundcables.Ifanon-Motorolarackisused,agroundcablemustbeusedforeachof
thesecomponentsplustheBCUII,whichrequiresagroundcablewithanyracktype.
Aninsulatingpadisattachedtothebaseoftheracktoelectricallyisolatetherackfromtheoor.
Structuralengineerprerequisite
Ensurethattheprocedure,tools,andequipmentrequiredtomounttheracktotheoorare
speciedbyaStructuralEngineer.
Requireditems
Thefollowingitemsarerequired:
Rack
10mmsocket
19mmsocket
6plasticshoulderwashers
Torquedriver
Crimpertool-AndersonPowerProductspartnumber1368-Hydraulichandtool,maximum
cablesizeof300MCM.
6carbonsteelgrade8.8boltsM12orotherboltsasdeterminedbystructuralengineer-
customersupplied.
Otheritems,speciedbythestructuralengineer,thatarerequiredtoinstalltherack.
Customersuppliedgroundcable,6AWGorlargerdiameter.
Two-holegroundlugandmountingnuts-partofrackhardwarekit.
3-668P09308A55-6
FEB2010