User's Manual
LTEeNodeBIndoorHardwareInstallationPreparingthesiteforequipmentarrival
•Thesitecanmaintaintheoperatingtemperaturerange.
•ThebuildingmeetsthevoltageandamperagerequirementsshowninDCsupply
equipment,Maincircuitbreaker,andDCinputcableonpage2-7.
•Thesitecanmeetthechassisdimensions(asshowninLTEeNodeBComponentDimensions
onpage2-4)andnotviolateanyoftherequiredclearances(asshowninFigure2-1).
•TheDCsupplyequipment,Maincircuitbreaker,andDCinputcablecalledoutinTable2-2
fortheLTEframeDCinputareeitherinstalledoravailabletobeinstalled.
•ThemountinglocationcansupporttheweightoftheLTEframeasstatedinTable2-1.
•TocomplywithUL/60950-1secondeditionsafetyrequirements,cablesconnectedtoAISG
andCustomerI/Omustbenomorethan42meters(140feet)andtheframeground
conductorsizemustbeaminimumof6AWG.
Procedure2-1Preparingtheoutdoorsitefortheequipment
Locatethedemarcationblocksforexternalutilities.
1
VerifythattheyareshownontheSiteEngineeringdocumentsanddetermine
therequiredcableroutingbacktotheequipmentframes.
2
Verifythefollowing:
•Availabilityofappropriateelectricalgroundconnectionsforthe
equipment.
•Compliancewithanysiteengineeringdocumentationandspecications.
•DCpowerisavailableandmeetsthesitedocumentationspecications.
•Poleand/orwallmountingstructuresareadequate.Ensurethata
qualiedstructuralengineerveriestheRRHwallorpolestructureand
wall-mountorpole-mountinstallationfortheweightoftheinstallation
underadverseconditionsintheinstallationarea.
•Outdoorcablerunsareinstalledandmeetlocalbuildingcodes.
•Customerinputterminationtiepointsareavailable.
•Availabilityoflightingandpowerforinstallation.
Preparingtheindoorsitefortheequipment
Performthefollowingsteps:
Procedure2-2Preparingtheindoorsitefortheequipment
Locatethedemarcationblocksforinternalutilities.
1
Continued
68P09308A55-62-3
FEB2010