User's Manual

LTEeNodeBIndoorHardwareInstallationPreparingthesiteforequipmentarrival
Thesitecanmaintaintheoperatingtemperaturerange.
ThebuildingmeetsthevoltageandamperagerequirementsshowninDCsupply
equipment,Maincircuitbreaker,andDCinputcableonpage2-7.
Thesitecanmeetthechassisdimensions(asshowninLTEeNodeBComponentDimensions
onpage2-4)andnotviolateanyoftherequiredclearances(asshowninFigure2-1).
TheDCsupplyequipment,Maincircuitbreaker,andDCinputcablecalledoutinTable2-2
fortheLTEframeDCinputareeitherinstalledoravailabletobeinstalled.
ThemountinglocationcansupporttheweightoftheLTEframeasstatedinTable2-1.
TocomplywithUL/60950-1secondeditionsafetyrequirements,cablesconnectedtoAISG
andCustomerI/Omustbenomorethan42meters(140feet)andtheframeground
conductorsizemustbeaminimumof6AWG.
Procedure2-1Preparingtheoutdoorsitefortheequipment
Locatethedemarcationblocksforexternalutilities.
1
VerifythattheyareshownontheSiteEngineeringdocumentsanddetermine
therequiredcableroutingbacktotheequipmentframes.
2
Verifythefollowing:
Availabilityofappropriateelectricalgroundconnectionsforthe
equipment.
Compliancewithanysiteengineeringdocumentationandspecications.
DCpowerisavailableandmeetsthesitedocumentationspecications.
Poleand/orwallmountingstructuresareadequate.Ensurethata
qualiedstructuralengineerveriestheRRHwallorpolestructureand
wall-mountorpole-mountinstallationfortheweightoftheinstallation
underadverseconditionsintheinstallationarea.
Outdoorcablerunsareinstalledandmeetlocalbuildingcodes.
Customerinputterminationtiepointsareavailable.
Availabilityoflightingandpowerforinstallation.
Preparingtheindoorsitefortheequipment
Performthefollowingsteps:
Procedure2-2Preparingtheindoorsitefortheequipment
Locatethedemarcationblocksforinternalutilities.
1
Continued
68P09308A55-62-3
FEB2010