User Manual
Index-86 Configuring, Installing, and Using Carrier Infrastructure
D
daisy chain cable see GPS Inter-base station
cable
daisy-chaining base stations, 5-57, 6-70
DHCP server equipment, 1-8
diagnostic cable
connections, 6-71
documentation
finding additional, preface-xiv
E
equipment
provided by service providers, 1-7
Ethernet
LED indicator, 6-69
Ethernet/power cable, 5-49
function of wires within, 5-49
splitting, 5-50
Expedience system
obtaining technical support for, preface-xvi
F
fuses
CBR, 6-72
replacing, 6-73
G
GPS
components of, 5-56
connecting to base station, 5-56
connector, 5-51
daisy-chained base stations, 5-57, 6-70
determining validity of output, A-79
exposure requirements, 5-56
interface cable, 5-51, 6-70
mounting pole and socket, 5-56
powering, 5-56
status codes, A-79
TDD impact, 1-7
time pulse generated, 5-56
used to generate time signal, 4-42
GPS inter-base station cable, 5-51, 6-70
grounding
CBR, 6-68
H
Hyperterminal
using to configure base station, 4-28
I
indoor/outdoor base station
overview, 1-2
inter-base station cable, 5-51, 6-70
ISPs
defining names, 3-22
L
lightning protection, 1-8, 5-55
antenna, 5-53
supplied through TVS module, 5-50
links
selecting, 2-12
local authority
setting up, 4-42
LOS requirement elimination, 1-1
M
MMDS frequency range
channels, B-81
mounting
brackets, 5-54
template, 5-54
N
network access
setting up for CPEs, 4-40
NNOS web interface
setting base station configuration
parameters, 4-33
P
power supply
for CBR, 6-65
provisioning server
user interface
New User page, 3-20
R
rack
attaching switch and power supply, 6-62
remote authority
setting up, 4-41
RS-232 cable, 4-28
S
serial interface
cable, 5-53
connector, 5-53
set airlink channel, 4-33
set airlink downlink power, 4-34
set airlink state, 4-38
set downlink bias, 4-35
SNMP server equipment, 1-8
SNMP session
setting base station configuration
parameters, 4-33
subscribers
typical of the Expedience system, 1-1
Syslog
setting up options, 4-39