Installation Instructions
System Requirements for Installation and Operation
42 (43) © Nokia Corporation DN00283911
Nokia Proprietary and Confidential Issue 2 DRAFT 1 - en
Note
Note
Table 9. Recommended tools and usage
Additional tools/equipment include:
• 2 x radio phones for communicating when testing the fibre optic cable
splicing
• Spirit level for checking the horizontal level of the MU and RU
• Tape measure
• Hammer
• Screwdrivers
• Crimping tool for assembling the power supply cable connector
A set of tools needed for assembling the cable connectors is available from Nokia.
• Cable stripper for assembling the power supply cable connector
• Power meter, including a 50 Ohm, 30 W, DC - 2GHz terminator and a set
of 7/16 N male and female RF adapters
The power meter should be a GSM 900/1800 or CDMA/TDMA/GSM 800/1900,
dual band, fully portable RF power meter with: high resolution, analogue/digital
readout and dBm/watt conversion capability
• Labels for labelling the origin and destination of cables
• Screwdriver for assembling the AC cable connector
• Ladder (depending on circumstances on site)
• Scaffolding, if working at height
• Cutter
• Wrenches
• Dynamometric wrench
• Scissors
• Allen keys, sizes 4 and 6 for fixing the MU to the mounting frame
• T20 Torx torque driver for removing and tightening the MU cover top
retaining screws (optional)
• Centre punch for marking hole locations in wall (optional)
• Drill with correct bits for the mounting position and location (if required)
• Extra lighting for splicing work area
• Table for splicing machine
• Set of Allen keys