Installation Instructions
Installation equipment
DN00283911 © Nokia Corporation 41 (43)
Issue 2 DRAFT 1 - en Nokia Proprietary and Confidential
6 Installation equipment
This section specifies the equipment that is recommended for the installation of
the Nokia InLite, but not included in the Nokia InLite delivery.
The recommended tools are:
Tool Used for
Torque driver, T10 Torx bit with min. 60 mm shaft Unit retaining screws
Torque driver, 4 mm Allen bit with min. 60 mm
shaft
MU mounting screws (5.5
Nm/4.06 ft-lb.)
Ground cable fixing (5.5
Nm/4.06 ft-lb.).
Cable ties Keeping cables tidy
Side cutting pliers Cutting cable ties
Splicing machine and tools Connecting optical fibres
Optical spool (about 500m single mode) Optical measurements
Optical cable cutting machine Cutting optical cables to
length
Cleaning kit Cleaning optical fibres
Optical Time Domain Reflectometer (OTDR) Testing optical fibres.
Shows signal trace and
attenuation.
Splice protection tubes Protecting optical splices
LMP cable Connecting the local
management PC to the
MU
Laptop PC (Pentium processor minimum) with
Supervisor Software Version 2.3.2 or higher
installed
Local management
functions
Antistatic wrist strap ESD grounding