Installation Instructions

Installation requirements
DN00283911 © Nokia Corporation 19 (43)
Issue 2 DRAFT 1 - en Nokia Proprietary and Confidential
4 Installation requirements
This chapter specifies the preparatory requirements for the installation of the
Nokia InLite system.
4.1 Checking the site
Before the Nokia InLite can be installed, the site must be properly surveyed and
prepared, and all the required external services must be correctly installed. The
site survey must identify any special requirements for the installation.
The site must meet the following requirements before the installation can begin:
1. The site is accessible and safe for working.
2. The safety distance calculations as presented in Nokia InLite: Warnings
and Cautions have been made and taken into account.
3. External connections for the MU (grounding point and mains power
supply) are available.
4. External connections for the RUs (mains power).
5. All required documentation is available, for example, site-specific
installation instructions and User Manual.
6. The correct delivery has been brought to the site.
4.2 Space requirements
The MU can be mounted on a wall, pole or other vertical support.
The RUs and the mounting rack can be mounted on a wall or pole or other vertical
support.
This section presents general issues that must be considered when choosing the
installation space.
4.2.1 Dimensions and weight
4.2.1.1 Main Unit
Figure shows the dimensions of the MU.