Installation Instructions

T echnical instructions for optic fibre installation testing
D N 00203719 © N okia Corporation 75 (79)
I ssue 2 D RAFT 1 - en N okia Proprietary and C o n f idential
Figure 39. C onnection of the optical source and pow er meter
A.5 Compliances
A declaration of compliance is required from the Subcontracto
r
technical specifications included in this chapter.
All the activities are supposed to be compliant with specifica
Subcontractor is responsible also for all of them, even if no
t
Splices on fibre optic cables have to be carried out by means
semiautomatic devices, so that to provide efficiency of the op
t
per the technical specification included in this appendix.
Installation procedures, materials and equipment must be compl
requirement concerning the adoption of the fusion splicing te
c
However, a preliminary agreement with the Project Manager is
n
these aspects.
Definition Attenuation Compliance Requirement is the maximum
a
value due to a single component in the optical connection.
T1
G1
G2
Visible
Optical
S ource
Termination
Splices
Downlink
T3
G4 G3
Visible
Optical
S ource
Uplink