Installation Instructions

Installation
D N 00203719 © N okia Corporation 65 (79)
I ssue 2 D RAFT 1 - en N okia Proprietary and C o n f idential
Note
Note
If other alarms are active, refer to Alarm Description.
It is possible at powerup, the BkUp alarm will be active. If t
click the BkUp button in the main window of the Supervisor sof
f
the BkUpwindow. The alarm should now be cancelled.
5.11.3 Recording RU and MU placing
Record the location of the MU and RUs in the Main Unit and Re
m
Placing window of the Supervisor Software.
More information on the software is provided in Nokia InLite: Commissioning.
5.12 Labelling the fibre optic cables
Label every FO cable at the RU and LU ends.
The label at each end should provide the following informatio
n
Floor/building where the RU is located
RU number
Downlink or uplink.
5.13 Fitting the Main Unit cover
This procedure is carried out after the Nokia Inlite System h
a
commissioned.
The assembly comprises:
Cable cover
Cable cover support
MU cover
Plastic cover lock