Installation Instructions
Installation
46 (79) © N okia Corporation D N 00203719
N okia Proprietary and C o n f idential I ssue 2 D RAFT 1 - en Status
Note
Note
2. Apply a drop of cleaning liquid (pure alcohol) to the edge of
then clean and dry it with a clean tissue,using a circular mo
v
Always use a clean tissue for each cleaning activity.
3. Remove any residue particles by using a cean dry air source.
4. Before reinserting the connectors, clean the adapter applying
cleaning liquid into its center hole and removing it immediat
e
clean dry air supply.
5. Reinsert the connectors into the adapter, avoiding any physica
the ferrules with fingers or with any other surface.
5.7 Connecting the cables to the Main Unit
The site will have been configured in accordance with the site req
u
location of the Remote Units (RUs) within the building complex and
optic cables associated with each RU are identified.
Do not remove fibre optic cable connector covers until required to
Do not bend the fibre optic cables beyond the recommended bend ang
ensures that the cables are not stressed or damaged in any way.
Figure shows the location of the MU cable connectors and the orga
n
optical fibre cables.