Installation Instructions

Installation
34 (79) © N okia Corporation D N 00203719
N okia Proprietary and C o n f idential I ssue 2 D RAFT 1 - en Status
Note
2. Position the U-plate onto the second lowest screw holes R3 and
to Figure .
The larger holes on the U-plate must be facing downwards.
3. To fix the U-plate and the lower pole bracket to the mounting
f
the M6 x 20 mm Allen screws through the U-plate and through sc
r
R3 and R4 into the screw holes on the lower bracket. Refer to
F
a torque driver with a 6 mm Allen bit to tighten securely.
4. Position the pre-assembled upper bracket on the pole. Make sur
holes for the screws R1 and R2 are on the upper edge of the fr
Refer to Figure .
5. Wrap the metal band tightly around the pole.
6. Insert the hook-shaped free end of the band into the band slot
screw housing.
7. Tighten the worm screw to 10 Nm (7.4 ft-lb) with an 8 mm hexago
8. Attach the mounting frame to the upper bracket from the fixing
and R2 with M6 x 20 mm Allen screws. Refer to Figure . Use a t
driver with a 6 mm Allen bit to tighten the screws.
9. Fix the mounting frame to the pole with the lower bracket. Fi
x
bracket in the same manner as the upper bracket.