Operation Manual

Nokia MetroSite GSM Base Station, Requirements for Installation and Operation
36 (38) © Nokia Networks Oy Internal Copy DN9913471
Issue 1 en DRAFT 2 Draft
Note
Additional equipment includes:
LMP cable for connecting the manager PC to the BTS
Antistatic wrist strap
Spirit level for checking the horizontal level of the BTS
Tape measure
Cable ties for routing the cables
Crimping tool for assembling the power supply cable connector (AC and
DC)
A set of tools needed for assembling the cable connectors is available at Nokia.
Cable stripper for assembling the power supply cable (AC and DC)
connector
Screwdriver for assembling the AC cable connector
Ladder (depending on circumstances on site)
10 mm spanner for removing the grounding bridge on the transmission unit
(optional)
T20 Torx torque driver for removing and tightening the BTS cover top
retaining screws (optional)
Centre punch for marking drilling hole locations in wall mounting
(optional)