Operation Manual
Table Of Contents
- Nokia MetroSite GSM Base Station, Requirements for Installation and Operation
- 1 About this document
- 2 Environment
- 3 Installation requirements
- 4 Cabinet interfaces and cables
- 5 Installation equipment
Nokia MetroSite GSM Base Station, Requirements for Installation and Operation
30 (38) © Nokia Networks Oy Internal Copy DN9913471
Issue 1 en DRAFT 2 Draft
Note
Note
Figure 7. Areas used for holding the cable cover parts during painting
8. Spray paint over the outside surface of the cover. Spraying should be done
at room temperature with relative air humidity of 50-65%.
The maximum thickness of the paint should not exceed 100 µm.
9. Dry the parts either in an oven or let the paint dry at room temperature
according to the paint manufacturer’s drying instructions.
The temperature of the drying oven must not exceed 90 °C (194 °F).
10. After the paint is dry, attach the cover top to the cover. Tighten the screws
to 1.6 Nm (1.18 ft-lb).