User's Manual
Minimum clearances
Clearances
2
Site meets the minimum clearances.
Check list
1. Check the clearances around
the plinth.
2. Turn the rear stopper.
3. Place the plinth on the floor,
grounding points facing
forward.
4. Bolt on the floor with 4 bolts,
12 mm (0.47 in.) in diameter.
Tighten to 49.0 Nm (36.1 ft-lb)
Plinth on the floor
min 100 mm
(3.9 in.)
Fan maintenance
space
500 mm (19.7 in.)
Plinth
360 mm
(14.1 in.)
300 mm
(11.8 in.)
75 mm
(3.0 in.)
Facility wall
75 mm
(3.0 in.)
back stop
13.5 mm
(0.5 in.)
(4 pcs)
600 mm
(23.6 in)
min 80 mm
(2.4 in.)
400 mm
(15.7 in)
Plinth on the wall
1. Mark screw locations according to the holes in the plinth and drill holes.
2. Fix the mounting screws on the wall and mount the plinth.
3. Tighten the upper mounting screws.
4. Tighten the lower mounting screws to a torque value of 49 Nm.
185 mm
482,5 mm
2
4
3
5
Note that the space required between plinths is 100 mm (3.4 inches).
Installing the
plinth
3
Note: In a stack, the minimum side clearance
is 75 mm (3 in.). The recommended clearance
for hand tying is 150mm (5.9 in.)
min 600 mm
(23.6 in.)
min 30 mm
(1.2 in.)
min 80 mm (3.2 in.)
with no back access
min 75 mm
(3.0 in.)
recommended
space for hand
tying 150 mm (5.9 in.)