User's Manual

Installation check list
Perform these checks to make sure that the installation is complete:
Delivery is complete and undamaged.
Site meets the minimum clearances.
Plinth is installed according to the instructions.
Modules are installed according to the instructions.
External power cables are connected.
Antenna jumper cables are connected.
Transmission cables and sub-modules are connected.
Plinth is grounded.
One module per casing is grounded to the plinth.
Internal power cables are connected.
Optical cables are connected.
BTS external cables or cables between the modules on different plinths are routed
via cable entries.
All boots and caps are properly connected and IP-sealed.
Only IP65 class cables with seals provided by Nokia Siemens Networks are used.
Optional cables (EAC, Synchronization, Site support interface, FPA interface,
LMP cables, RF cables) are connected.
Module front covers are installed.
BTS is switched on and all units are ready.
Site is clean and installation completed.
Screws are tightened to the specified torque value.
Note: In pole and wall installations, screws are secured with thread locking compound.