User's Manual
6-64 Configuring, Installing, and Using Carrier Infrastructure
b Insert the threaded end of the rod through the corresponding opening on the MP1
clamp.
c Assemble a large washer, large lock washer and nut around the threaded end of the rod.
Tighten the nut.
4 Hang the base station on the TOP clamp, using the slots in the MP2 clamp.
a Make sure the flat washers, lock washers, and bolt are behind the clamp bracket.
b Tightly fasten the bolts into the base station, in order to securely hold the base station to
the bracket.
Figure 6.15 Threaded rod assembly, top clamp
Step 3a
Step 3c
Step 3b
Figure 6.16 MP2 top pole clamp, slots used to hang base station
Slots used to hang base station