Operation Manual
USER MANUAL ENGLISH
9099636000 - SCRUBTEC 343.2 17
Recovery tank emptying
1.  Turn the switches (62) and (63) to “0” position to switch off the machine.
2.  Lift the squeegee (59).
3.  Drive the machine to the appointed disposal area.
4.  Insert the positioning pin (24) and lift the brush/pad-holder by engaging the transport/parking device (23a).
5.  Empty the recovery tank (30) with the drain hose (16). Then, rinse the tank with clean water.
Solution tank emptying
Perform steps 1 to 4.
6.  Empty the solution tank (31) with the hose (18).
7.  Then, rinse the tank with clean water.
AFTER USING THE MACHINE
After working, before leaving the machine:
1.  Remove the brush/pad-holder as shown in the Machine 
Transport/Parking paragraph.
2.  Empty the tanks (30 and 31) as shown in the previous 
paragraph.
3.  Perform the daily maintenance procedures (see the 
Maintenance chapter).
4.  Store the machine in a clean and dry place, with the brush/
pad-holder and the squeegee lifted or removed.
RECOVERY TANK REMOVAL
To check or charge the lead (WET) batteries, or to perform 
other procedures, it may be necessary to remove the recovery 
tank (30) as shown below.
1.  Make sure that the switches (62 and 63) are turned to “0”.
2.  Empty the recovery tank (30) as shown in the relevant 
paragraph.
3.  Drive the machine on a level oor.
4.  Disconnect the vacuum hose (22) from the squeegee (11).
5.  Disconnect the recovery water drain hose (16) from the 
bracket (17).
6.  Open the cover (6).
7.  Grasp the recovery tank (A, Fig. 6) in the area (B) and 
slightly raise it.
8.  Disconnect the vacuum hose (C) from the tank, then 
remove the tank (A) with the hoses (D) and (E).
BA
C
D
E
Figure 6
P100641
MACHINE LONG INACTIVITY
If the machine is not going to be used for more than 30 days, proceed as follows:
1.  Perform the procedures shown in After Using the Machine paragraph.
2.  Disconnect the battery connector (29).
3.  Store the machine in a clean and dry place.
FIRST PERIOD OF USE
After the rst 8 hours, check the machine fastening and connecting parts for proper tightening. Check the visible parts for integrity 
and leakage.










