Installation Guide
CLR Kit Installation With Existing Frame
Make sure all power is turned o before beginning installation
Turn on power and verify proper operation.
7
Fasten the LED retrot kit MC cable to the J-Box using the included MC connector.
3
Make wiring connection to junction box. 
a.  Connect Black wire to line wire.
b. Connect White wire to neutral wire
c. Connect Green wire to ground wire
d. Route and connect Purple and Grey 0-10V dimming  
control wires in accordance with dimmer instructions  
and electrical code.
4
Put back J-Box cover plate 
(with lamp ballast still 
attached to it).
5 
Lift upward on retention tabs while pushing the retrot 
kit through the rough-in, release the retention tabs and 
push trim ush to the ceiling, ensuring a secure t.
6
EXISTING BALLAST BOX
LINE
Black (line)
Ground
White (neutral)
Purple (dim +)
Grey (dim -)
Black (line)
Green (ground)
White (neutral)
Purple (dim +)
Grey (dim -)
CLR
NOTE:  If 0-10V dimming is NOT to be connected, it is recommended to cut o the exposed, tinned leads on the purple and 
grey wires, and cover the ends with a small piece of electrical tape or wire nut. If bare 0-10V control wires should 
accidentally touch a grounded surface, it could cause unintended ickering or dimming of the light xture.




