Installation Guide

INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS
Review Date: 11/26/18
Original Date: 2/16/88
CAUTION: Only qualified personnel should undertake the procedures outlined in this
document. NIBCO INC., its agents, representatives and employees assumes no liability for
the use of these procedures. These procedures are offered as suggestions only.
NIBCO Technical Services • Phone: 1.888.446.4226 • Fax: 1.888.336.4226
INSTALLATION AND MAINTENANCE GUIDELINES
FOR
2-PIECE
BRONZE/BRASS BALL VALVES
SOLDERED & THREADED END CONNECTIONS
T/S-580-70
T/S-580-70-66
T/S-585-70
T/S-585-70-66
T/S-585-70-HC
T/S-585-70-66-HC
T-580-70-SV
T-585-70-SV
T/S-585-70-SU
T/S-585-70-66-SU
T-585-70-66-ST
T-580-70-UL
T-585-70-UL
TM-585-70-66
T/S-585-70-W3
T/S-585-70-66-W3
FP600A
FP600A-LF*

Summary of content (4 pages)