Instructions / Assembly

Post Cover install cont.
9) Attaching the Cap. Apply adhesive around the top surface of the
post. (Fig. 8) In addition, apply adhesive to the inside top of the cap
along the inside ledge. ( Fig. 9)
10) Install Rail Mounts. After locating the desired height of the railing
and securely attaching the mounts (see #5), measure up on the outside
of the post cover, and select the spot to place the landing. In this exam-
ple Trex ™ universal mounts are used. When the landing location is de-
cided, dry fit the landing on the rock surface. Using a carpenter knife or
chisel, cut out the high points of the rock surface to achieve a smooth flat
surface. (Fig 10-13)
11) Using 3" deck screws minimum, attach the mount to the post, screwing through the pillar
into the landing attached in section 5. (Fig. 14-15)
12) Finish the job using NextStone Textured Grout and Paint kit to
cover any space around the mountings and to hide screw heads .
(Grout and Touch Up Kit sold separately). (Fig. 16)
(Fig. 8)
(Fig. 9)
(Fig. 10) (Fig. 11)
(Fig. 12)
(Fig. 13)
(Fig. 14)
(Fig. 15)
Finished Post and Cap
Use 3” screw
(Fig. 16)