Instructions / Assembly

2 Piece Post Cover install cont.
9) Aaching the Cap. Apply adhesive around the top surface of the
post. (Fig. 8) In addion, apply adhesive to the inside top of the cap
along the inside ledge. ( Fig. 9)
10) Install Rail Mounts. Aer locang the desired height of the railing
and securely aaching the mounts (see #5), measure up on the outside
of the post cover, and select the spot to place the landing. In this exam-
ple Trex ™ universal mounts are used. When the landing locaon is decid-
ed, dry t the landing on the rock surface. Using a carpenter knife or
chisel, cut out the high points of the rock surface to achieve a smooth at
surface. (Fig 10-13)
11) Using 3" deck screws minimum, aach the mount to the post, screwing through the pillar
into the landing aached in secon 5. (Fig. 14-15)
12) Finish the job using NextStone Textured Grout and Paint kit to
cover any space around the mounngs and to hide screw heads .
(Grout and Touch Up Kit sold separately). (Fig. 16)
(Fig. 8)
(Fig. 9)
(Fig. 10) (Fig. 11)
(Fig. 12)
(Fig. 13)
Finished Post
(Fig. 14)
(Fig. 15)
Use 3” screw
(Fig. 16)