Installation Guide
BASIC TOOLS AND MATERIAL 
SAFETY EQUIPMENT 
Always wear safety glasses for eye protection. Wearing a dust mask is recommended. 
HAND TOOLS 
Power Drill 
Saw 
Chalk Line 
Stud Finder 
Tape Measure 
FASTENERS 
Finishing Nails 
Screws 
Toggle Bolts 
ADHESIVE  
Construction Adhesive (compatible with Polyurethane) 
Caulk or Wood Filler 
ADDITIONAL MATERIAL 
2x4 Sanded Smooth Lumber Board - used for framing to secure the beams. 
(The 2x4 can be cut into smaller blocks and installed onto  the ceiling every 3 to 6 
feet to provide a secure platform for the beams to attach to.)  
Before installation, acclimate the beams to the application site for at least 24 hours. 
Open the box and let the beams “breathe”.  
For most applications, toggle bolts are recommended to secure to the wood blocks or 
boards to ceiling.  
IMPORTANT NOTES 