Installation Guide
 19 
 CORNER INSTALLATION 
All products must be allowed to acclimate; removed from boxes and stored flat at the 
installation site for a minimum of 48 hours or until properly acclimated prior to 
installation. Heat and moisture cause expansion. Best results are obtained by installing 
cool, dry product. NextStone does not warrant against gapping caused by expansion 
and contraction. 
Step 1 
Metal Starter Strip - Determine at what height above grade level 
you want the panel to sit on. Measure up 2 ¾" from this point and 
strike a level line. Attach the top of the starter strip on this line. End 
the strip 2" from each side of the corner. 
Step 2-Set the Stacked Stone outside corner piece against the 
corner and down into the starter strip. Use the screw guides and 
place at least 3 screws along the tongue. Place 2 screws in the 
right lap side of the panel where indicated. (Fig. 7). 
Figure 7 
Step 3-Attach the panels working out from each side 
of the corner as previously described. (Fig. 8) 
Figure 8 
Note: There are 4 patterns of the Stacked Stone Outside Corner. 2 Left patterns 
and 2 right patterns. Check for numbers on the backside of each corner piece. 
They are numbered 1 through 4. Alternate left and right corners with each course 
to ensure offsets and to prevent pattern repetition. 
STACKED STONE OUTSIDE CORNER  










