Installation Guide
 40 
SLATESTONE 1 & 2 PC POST COVER, Cont. 
9) Attaching the Cap. Apply adhesive around the top  
surface of the post. (Fig. 8) In addition, apply adhesive to 
the inside top of the cap along the inside ledge. ( Fig. 9) 
10) Install Rail Mounts. After locating the desired height of 
the railing and securely attaching the mounts (see #5), 
measure up on the outside of the post cover, and select the 
spot to place the landing. In this example Trex ™ universal 
mounts are used. When the landing location is decided, dry 
fit the landing on the rock surface. Using a carpenter knife 
or chisel, cut out the high points of the rock surface to 
achieve a smooth flat surface. (Fig 10-13) 
Use 3” screw 
11) Using 3" deck screws minimum, attach the mount to the post,  
screwing through the pillar into the landing attached in section 5.
(Fig. 14-15) 
12) Finish the job using NextStone Textured Grout and Paint kit 
to cover any space around the mountings and to hide screw heads . 
(Grout and Touch Up Kit sold separately). (Fig. 16) 
Finished Post and Cap  
(Fig. 16) 
(Fig. 15) 
(Fig. 14) 
(Fig. 13) (Fig. 12) (Fig. 11) (Fig. 10) 
(Fig. 9) 
(Fig. 8) 










