Installation Guide
 34 
SLATESTONE COLUMN WRAP 
1) Fir out the desired column to 12 ¾" x 12 ¾".  
2) Starter Strip- Determine the height above ground the  
bottom of the column should be. Measure up 2 ¾" from this 
point and strike a level line. Attach the top of the starter strip 
on this line. Level and Attach starter strip on each face,  
stopping 2" from each corner.  
3) Each box contains 2 left (L-2,L-4)and 2 right corners 
(R-1, R-3). 2 boxes are needed per 2 courses. Use 4 right 
pieces for 1 course and 4 left pieces for the next course. Dry 
fit 
corners R-1, R-3 and R-1, R-3. Slide down onto the starter strip 
and attach all pieces where indicated on the screw hem.  
4) Attaching the Corners- There are 3 screw points on the long 
side of the corner, and 2 on the shorter end. Make sure to use 5 
screws per corner. Hold the bottom edge of corner snug against the 
substrate while placing the screws to prevent over tightening of 
the screw hem. This prevents the bottom edge from kicking out. 
5) Dry fit corners L-2, L-4 and L-2, L-4. Slide down and 
attach as described above. 
6) For the next course, use corners R-3, R-1 and R-3, R-1 to 
prevent pattern repetition. Finally use corners L-4, L-2 and L-4, L
-2 for the 4th row. Continue to alternate as needed until the de-
sired height is achieved. 
Note to Installer: Do not over tighten the screws 
when attaching the corner pieces. When over tight-
ened, the corner piece will “kick out” at the bottom 
and create a gap. If the gap is present, pull the cor-
ners together to minimize the gap, then face screw through the 
female tongue, through the male base plate, and into the sub-
strate. Use a 3" deck screw for this purpose. Use NextStone caulk 
to fill screw head and NextStone touch up paint for a professional finish. 
Screw Placement 
2nd Course 
1st Course 
COLUMN WRAP INSTALLS FROM 
FLUSH CORNERS 










